The report of ITE content of reports of technical inspection of buildings owners of real estate have a duty to keep them in conditions of safety, sanitation and public adornment, doing precise work and works to keep or rehabilitate them, in order to maintain at all times the conditions required for their habitability or effective use. Through technical inspections is intended to avoid the consequences generated by the absence of a proper conservation in buildings. The report by ITE. Content. The legal obligation to carry out technical inspection of buildings, in those municipalities in which is mandatory, is verified by obtaining, at expense of the owners (or legitimate holders), a report issued by a competent technician. Said technical should be designated by each building owner and the report that write must have the content and the form set out in the corresponding municipal Ordinance of ITE. Normally, the content will include similar information to the list to continuation: date of the visit, flat situation and photographs of the detailed description of building damage and deficiencies appreciated property causes these defects and deficiencies necessary measures to resolve the flaws and deficiencies, with indication of an order of priorities and a quote inspection result: favourable if the building meets the conditions of stability, security, leaks, consolidation and habitability, or well unfavorable, if not meets visa and presentation of ITE reports must be duly endorsed by the professional order that corresponds to the technical editor and the municipality, so a prudent technical selection shall include verification that it is effectively registered and that have the required liability insurance coverage.

After the collegiate visa, the ITE report must be presented in the Council within the deadline imposed by the Ordinance. Repair of defects and deficiencies a report of ITE that expresses the need to undertake works to solve malfunctions and deficiencies normally it will be the obligation of the owner of the building of apply for the corresponding license of works, which must contemplate the rectification of all faults and deficiencies identified. After rectification, normally need be presented at City Hall a certificate final of the works carried out duly stamped by the relevant professional association. Urgent action in extreme cases, after the technical inspection of the building may be necessary to adopt urgent measures to be executed immediately. These measures are motivated by a situation of imminent danger. They can normally run without prior license application, it’s enough with a supporting technical report.