Diamond Cutting

Create individual and intimate layout of your home, select your apartment from a number of typical building solutions wishes everyone. It is easily the case with the premises, where partitions are gozobetonnyh or partition wallboards, although they have their flaws, working with them does not require major building interventions. The hardest thing the owners of apartments with monolithic walls or panels production houses. But here, no despair, modern diamond cutting concrete structures will help you express your individual style, and it is not a hindrance nor a stone nor iron. Determining the location of a new opening or arch must first obtain a plan of premises in HOAs.

In this regard indicated the structure of internal walls, more marked in bold structural engineering, more subtly marked with other partitions, with the dismantling of the problems which practically does not occur. Diamond cutting bearing designs require more thorough approach and is divided into several stages. First, you need to invite a specialist design office (in homes, only put into operation, refer to the Engineer Tehnicheksogo supervision of construction and to obtain permission from the designer is your house) to get the project making the opening and, if necessary, a way to strengthen and production design work (BPD). Second, choose a construction company or a private operator for the production work on the diamond cutting of the opening and subsequent amplification of the opening. Then pay attention to the cost of working skills, not Wall to ask questions, kotntrolirovat compliance CPD alert with shock effects on the supporting structures. And third, it is necessary to prepare a set of documents for obtaining a permit redevelopment dwelling. The period for consideration and decision-making can reach 8-10 months from the filing date. You can also turn to specialized companies, then all the signatures will be collected trustee, but this service is 60-100 rubles.

It is worth remembering that the redevelopment of residential premises prohibited interference in the building facades (although judging by the large number of commercial establishments on the ground floors of houses, this story bypass) complete dismantling of the bearing structures, construction of new residential premises without a window opening, increase in area of kitchen orders. site, a bathroom at the expense of living space, increasing the area of the dwelling at the expense of food, san. site, a bathroom room remodeling, resulting in less floor space turned out, than it was before it, the installation of steam radiators and underfloor heating device on the balconies and terraces, the elimination / reduction of channel cross section natural ventilation. In case you are not authorized alterations may face a fine, an order of coordination of production of the opening or moving partitions in 2-4 months, or the decision to bring all the original mind.